Manufacturing facility status |
| Mechine |
Model |
Quantity |
Specification |
Origine |
Made year |
| Vertical horizontal injection machine |
DKV-85 |
7 |
6 ~ 4ton |
Korea |
1997.8 |
| Injection machine |
|
2 |
1 oz |
Korea |
1999.2 |
| Squeezer |
AP-KI |
5 |
1 ton |
Korea |
2003.1 |
|
| CNC Composite Shelf |
SQC-32 |
2 |
¨ª32 |
Korea |
2006,4,20 |
| CNC Turn-mill Shelf |
PUMA 240 |
1 |
¨ª350 Mill |
Korea |
2006,4 |
| CNC Shelf |
LYNX 220 |
2 |
¨ª300 |
Korea |
2006,4 |
| Automatic Shelves |
JF-32 |
16 |
¨ª32- ¨ª12 |
Taiwan |
1996,5 |
| Forming machine |
P-25 |
2 |
CU PIPE,¨ª25 |
Korea |
2001 |
| Automatic Bending Machine |
B-6 |
1 |
CU PIPE |
Korea |
2002 |
| Ultrasonic Washing Machine |
CJ-003 |
1 |
TC type |
Korea |
2000 |
| Low speed shredder |
|
5 |
1 HP |
Korea |
|
| Bench Shelves |
D-32,SN-20 |
5 |
¨ª32,¨ª20 |
Korea, Japan |
2000, 1990 |
Status of inspection facilities |
 |
| Laboratory (Digital Projector and thermostat) |
|
 |
| Conduction insulation tester |
|
| Type |
Company |
Quantity |
Purchase year |
Calibration cycle |
| Conductive insulation tester |
Dongseung AV |
1 |
|
|
| civil voltage tester |
SHIMPO |
1 |
|
once a year |
| Tensile testing machine |
YuYu |
1 |
|
|
| Thermostat |
Hwashin |
1 |
|
|
| Insulation resistance measuring instrument |
mitutoyo |
1 |
2005~2006 |
once a year |
| Micrometer |
mitutoyo |
10 |
2006 |
³â 1ȸ |
| Digital Micrometer |
mitutoyo |
5 |
2005~2006 |
once a year |
| Vernier Callipers |
mitutoyo |
20 |
2005~2006 |
once a year |
| Digital caliper½º |
mitutoyo |
4 |
2006 |
once a year |
| Internal Diameter Gauge |
mitutoyo |
5 |
2006 |
once a year |
| Digital Projector |
mitutoyo |
5 |
2006 |
once a year |
Produce chart |
|